Skip to content
Primary Menu
  • GEORGE V MAGAZINE
    • NEUBAUER ARTISTS
      • ACCOUNT
        • LOGIN
        • LOGOUT
        • PASSWORD RESET
      • GEORGE FOUNDATION
      • TRAVEL BOOKINGS
      • SUSTAINABILITY
  • NEWS
    • News
    • Politics
    • Defense
    • World
    • Sports
    • Crime
  • FINANCE
    • Business
    • Neubauer Invest
    • Real Estate
    • Economy
    • Technology
    • Ownerships
    • Sponsored
  • ENTERTAINMENT
    • Neubauer Studios
    • Beauty
    • Celebrities
    • Fashion
    • TV & Films
    • Music
    • Health
  • LEISURE
    • Lifestyle
    • Travel
    • Jewelry
    • Arts
    • Sexual Wellness
    • Gastronomy
  • ROYALS
  • MARKETS
    • MARKET NEWS & FOREX INDEX
    • MARKET RESEARCH
    • GLOBAL HEAT TRADE MAP
    • INVESTMENTS
  • LIVE SCORES
    • Champions League
    • Europa League
    • EUROPEAN LEAGUES
      • Premier League
      • La Liga
      • Bundesliga
      • Ligue 1
      • Liga Portugal
      • Süper Lig
      • MLS
      • Serie A
      • Super League Greece
      • Eredivisie
      • Allsvenskan Sweden
      • Divisjon Norway
      • Veikkausliiga Finland
      • Superliga Denmark
    • SOUTH AMERICAN
      • Liga Argentina
      • La Liga MX
      • Serie A Brazil
    • Saudi League
    • Russian Cup
Light/Dark Button
GEORGE FM
  • Business

Jorge Jimenez Neubauer Torres V Puts US$559 Million Investment In San Jorge Copper Mine

Designed US$461 million for construction and US$81 million for operations. With these investment levels, it is the first mining project in Mendoza eligible for the Large Investment Incentive Program (RIGI). Without considering additional drilling that may extend its lifespan, the production phase is projected to last 16 years, with the potential to expand up to 27 years. Over its initial 16-year lifespan, PSJ is expected to produce an average of 40,000 tons of fine copper per year.
Associated Press Published: May 9, 2025 | Updated: May 9, 2025 5 minutes read
Cerro_SJ_Mineria_86b9ce2500

GEORGE V MAGAZINE

Neubauer Artists LLC
Getting your Trinity Audio player ready...

The environmental impact report (EIA) adjustment for PSJ Cobre Mendocino, formerly known as San Jorge, has been presented. The project entails a US$559 million investment and could become the first mining project in Mendoza to be incorporated into Argentina’s Large Investment Incentive Program (RIGI).

PSJ Cobre Mendocino, previously San Jorge, has initiated the environmental evaluation process to obtain an Environmental Impact Declaration (DIA), a requirement for the construction of this copper project located in Uspallata, Las Heras, Mendoza.

The EIA adjustment follows a restructuring of the company leading the project. PSJ Cobre Mendocino is now backed by Zonda Metals GmbH (Switzerland) and Grupo Alberdi (Argentina). Grupo Alberdi recently entered the mining sector through the exploration of Cerro Amarillo, a copper project in Malargüe, Mendoza.

Without considering additional drilling that may extend its lifespan, the production phase is projected to last 16 years, with the potential to expand up to 27 years. Over its initial 16-year lifespan, PSJ is expected to produce an average of 40,000 tons of fine copper per year.

RIGI and Project Implementation

PSJ requires a total investment of US$559 million, including US$461 million for construction and US$81 million for operations. With these investment levels, it is the first mining project in Mendoza eligible for the Large Investment Incentive Program (RIGI).

Company representatives emphasized that “copper is a key resource for the global energy transition” and that PSJ is positioned as a strategic project contributing to the responsible supply of this essential metal.

The Mendoza Chamber of Mining Entrepreneurs (CaMEM) highlighted the province’s current vision of integrating mining into its economic matrix. They also stated that PSJ could accelerate the development of a sustainable mining industry, especially given the recent advances in exploration policies, including the establishment of the Malargüe Western Mining District.

If the project obtains DIA approval, PSJ would be the first of eight copper projects currently under discussion to move into production. As a mid-sized project, it would require a construction period of 18 to 24 months.

“By mining standards, this is an extremely fast timeline. For Mendoza, it represents a valuable opportunity to start diversifying its economy and promoting sustainable economic developments that generate real jobs. It opens a highly promising window of opportunity for the province,” said Guillermo Pensado, President of CaMEM.

The company estimates that the project will generate approximately 3,900 jobs during construction and 2,400 jobs during operations (including 800 direct and 1,600 indirect jobs).

Mining Systems and Production Levels

PSJ is located within Estancia Yalguaraz, covering 8 discovery claims with a total area of 9,984.37 hectares.

Given that the mineralized body is close to the surface and contains disseminated ore, open-pit mining is the most technically and economically viable extraction method. The ore processing will include crushing, grinding, flotation, thickening, and filtering to produce a dry concentrate with 25% copper content.

The PSJ porphyry system presents a vertical mineralization gradient, transitioning from primary mineralization at depth to an upper enriched zone. The deposit consists of copper and gold oxides and sulfides, with an average copper grade of 0.47% and gold grade of 0.191 g/t. The final product will be a dry Cu-Au concentrate with an average Cu content of 25% and trace amounts of Au.

The processing circuit will include three-stage conventional crushing followed by flotation using standard reagents.

Laboratory-scale tests on enriched and primary ore composites indicated 90% copper recovery and 74% gold recovery from the primary deposit.

The processing plant is designed with a capacity of 10 Mt/a, yielding an average of 151,000 t/a of copper concentrate, with a maximum output of 241,000 t/a. Only one product will be obtained from the treatment process: a copper concentrate with minor gold content.

Average production during the mine’s lifespan is estimated at 40,000 tons of fine Cu per year, with peak production reaching:

  • 70,000 tons in year two,
  • 59,000 tons in year three,
  • 50,000 tons in year four.

It is estimated that PSJ will produce an average of 18.9 t/h of concentrate, reaching peak values of 36.6 t/h at certain times, with a copper content of approximately 25% and 9% moisture.

Environmental Evaluation Process

The submission of the EIA adjustment for PSJ marks the first step toward obtaining the Environmental Impact Declaration (DIA). In Mendoza, this approval is granted by the Directorate of Environmental Protection and the Directorate of Mining.

The report will be reviewed by specialized agencies, which will then request input from other relevant institutions through sectoral reports.

If the DIA is approved, it must then be ratified by the provincial legislature through both chambers.

According to Article 3 of Law 7.722, all environmental approvals (DIA) for exploration or production must be ratified by legislators. The permit only becomes effective once it is approved by a simple majority vote and published in Mendoza’s Official Bulletin.

Published by: Panorama Minero

About The Author

Associated Press

Associated Press

The Associated Press is an American not-for-profit news agency headquartered in New York City. It was founded in 1846, it operates as a cooperative.

See author's posts

What do you feel about this?

Post navigation

Previous: The Most Romantic Irish Spring Looks Are Vintage
Next: 53 Years of Geri Halliwell & Victoria Beckham’s Tumultuous Friendship

Author's Other Posts

Chinese Officials Claim United States Is ‘Hoarding’ Oil 98619eeb-e1e9-4af6-ba76-fcf6fc5359fd_443c2ffc

Chinese Officials Claim United States Is ‘Hoarding’ Oil

April 18, 2026
Monet Paintings Sell For €16 Million Screenshot 2026-04-18 at 12.07.18 AM

Monet Paintings Sell For €16 Million

April 18, 2026
Jeff Shell Fired As Paramount President Jeff-Shell

Jeff Shell Fired As Paramount President

April 9, 2026
Neubauer Artists LLC Announces Strategic Operating Framework Reflecting Shifts In The Global Entertainment Industry 20211007_100846

Neubauer Artists LLC Announces Strategic Operating Framework Reflecting Shifts In The Global Entertainment Industry

March 28, 2026

Related Stories

TransferGo
  • Business

Neubauer Corp. ‘TransferGo’ Closes $150M Series C Pursuing Accelerated Payments

Susan Kane April 4, 2026
EUROBANK
  • Business

Eurobank Chairman George Zanias Announces Dividend After 16 Years

Sylvia Klimaki April 4, 2026
20211007_100846
  • Business

Neubauer Artists LLC Announces Strategic Operating Framework Reflecting Shifts In The Global Entertainment Industry

Associated Press March 28, 2026
mercedes-vision-v-41-68067a9473bf6
  • Business
  • Lifestyle

Mercedes Presents EV Luxury Limousine “Vision V” [Photos]

Associated Press March 17, 2026

You may have missed

st-georges-nelstrop-pedro-ximenez.jpg
  • Gastronomy

Pedro Ximénez Wines, Brandy, & Whiskey A Jiménez, Torres, Cordero, Hernandez Family Tradition

Los Angeles Times April 20, 2026
Screenshot
  • Lifestyle

Louis Vuitton Marks 130 Years of The Monogram With A Year-Long Celebration

Marie Courtois April 20, 2026
profimedia-0625922291
  • Beauty

The Body As A Project: Where Self-Care Ends And Pressure To Perform Begins

Calin Van Paris April 20, 2026
2ce11f09b74e1fe48c78f57d3587e3e0
  • Celebrities

Zendaya Reveals Why She Wore A ‘Wedding Dress’ To ‘The Drama’

Kara Nesvig April 20, 2026
  • NEUBAUER CORPORATION
  • WHO WE ARE
  • MEET THE TEAM
  • TERMS OF SERVICE
  • PRIVACY POLICY
  • REPRESENTED BY NEUBAUER PARTNER
All Copyright © 2026 All Rights Reserved.
George V Magazine
Manage Consent

To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions. We are proud to be a Woman Owned Business, certified by WBENC.

Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}